INSTALLATION OF THE PRODUCTION LINE HAS STARTED

The process of installation of a prototype trial production line has started, which is in accordance with the production line configuration scheme: assembly of equipment units, automation works, provision of equipment connections and adjustment of the equipment in accordance with technological drawings.

 

The production line is installed by the equipment manufacturer and supplier SIA ELEKTRO VILKS and installation works are expected to be completed in 3 months.

 

Configuration diagram

 

The prototype trial production line is installed in the production premises owned by SIA Balticfloc in Cesis, at Ata Kronvalda Street 40/22 - 601.

 

Layout of the production line in the room

 

Before the commencement of the production line installation process, the premises of Balticfloc were adapted for the installation of the new production line.

Supply of gas and electricity of sufficient capacity was ensured, the premises were cleared from unnecessary equipment, and a couple of existing Balticfloc production units were moved clearing space for the new production line.

The current warehouse of raw materials was moved to other premises. The premises were extended by removing the partition wall between the warehouse of raw materials and current production premises.

 

The production line installation works will be followed by the launch and testing of the line. Also, work has started on testing of a recipe of an innovative heat insulation material by developing an optimal formula for heat insulation plates (density, composition, thermal conductivity, air and sound permeability).